Project Super X
Semiconductor Fabs
Vancouver, WA
About
This Work
Greenfield design/build semiconductor foundry facility consisting of a 337,000 sq. ft. manufacturing facility with 40 MVA electrical capacity to support Class 100–100,000 cleanrooms and supporting environments. MEC provided electrical engineering leadership for medium and low voltage distribution, UPS, and emergency power systems.
Project Specifications
Facility Size:
337,000 sq. ft.
Electrical Capacity:
40 MVA
Classrooms:
Class 100–100,000
UPS:
3 × 1200 kW units with distribution system
Medium/Low Voltage:
Cablebus distribution, redundancy, and E-House integration
Powering Your Vision
From the first spark of an idea to a fully energized project, MEC is here to make your electrical solutionssmarter, safer, and stronger. Let’s bring it to life.