Project Super X
Semiconductor Fabs

Vancouver, WA

About

This Work

Greenfield design/build semiconductor foundry facility consisting of a 337,000 sq. ft. manufacturing facility with 40 MVA electrical capacity to support Class 100–100,000 cleanrooms and supporting environments. MEC provided electrical engineering leadership for medium and low voltage distribution, UPS, and emergency power systems.

Empty industrial warehouse or manufacturing facility with shelves, pallets, and machinery.

Project Specifications

Facility Size:

337,000 sq. ft.

Electrical Capacity:

40 MVA

Classrooms:

Class 100–100,000

UPS:

3 × 1200 kW units with distribution system

Medium/Low Voltage:

Cablebus distribution, redundancy, and E-House integration

Similar Semiconductor Facility Projects



Winbond



View Project >

A spacious data center room filled with server racks and electronic equipment with bright lighting.



ProMOS



View Project >

A spacious, bright data center with numerous white server racks and control panels, and modern overhead lighting.
A two-story restaurant with outdoor seating on the top level, decorated with string lights, and indoor dining visible through large windows during evening hours. Several people are walking on the sidewalk outside.

Powering Your Vision

From the first spark of an idea to a fully energized project, MEC is here to make your electrical solutionssmarter, safer, and stronger. Let’s bring it to life.

Contact Us
A black and white silhouette of a fetus within an artificial womb