ProMOS Semiconductor Facility
Taiwan
About
This Work
A large-scale greenfield semiconductor manufacturing campus totalling 2,000,000 sq. ft., including a 300,000 sq. ft. Class 1 cleanroom and an extensive central utility building (CUB). MEC provided full high-voltage electrical engineering, including the design of a 161 kV primary substation and the complete 12.47 kV sitewide distribution system. The project required highly reliable power infrastructure, redundancy planning, and integration with advanced cleanroom and process equipment systems.
Project Specifications
Facility Type:
2,000,000 sq. ft. greenfield semiconductor fabrication plant
Cleanroom Space:
300,000 sq. ft. Class 1 cleanroom
Utility Infrastructure:
Central Utility Building with sitewide mechanical & electrical systems
Power Systems:
161 kV high-voltage primary substation
12.47 kV medium-voltage distribution system
Redundant feeders for fab reliability
Coordination with process tool power requirements
Specialized Systems Supported:
Cleanroom environmental controls
High-density process equipment loads
Critical power reliability planning
Integration with CUB systems (UPW, CDA, HVAC, cooling)